Saturday, December 14, 2013

Getting back to the track

Although I still can not put in the four to six hours a day I was doing, it's back to work.  During the last four weeks I have made 58 trees, including four new apricot trees for the orchard (to be planted in the spring).  Also completed: the west side retaining wall and cliffs now have vegetation and the tracks both above and below this area are ballasted with scenery and trees.

This week, Mark and I put in the cemetery and I am almost finished landscaping it, and the nearby pond.  The tombstones are tiny, but by adding dirt to highlight each, they can be seen.

Next week we'll add another batch of fusion fiber to smooth out the hills.  I find that doing the scenery while the fusion fiber is initially moist works far better than coming back afterwards.  It takes more time, but the results are worth it.

Wednesday, October 30, 2013

Slightly inactive.

During September, I was concentrating on making trees and shrubs, off the layout, for future use, as well as defining the ballast and scenery around the edges of the layout.  At this point I'd estimate the rough scenery away from the town is 25% complete.

Unfortunately, in early October a routine medical procedure turned critical and I landed in the hospital for a week, having a procedure I never expected to need.  Recovery time is estimated at eight weeks or longer, but hopefully I should be able to continue working on simple scenery projects by mid-November, and be back to full activity by early 2014.

Tuesday, October 29, 2013

Update: October 29th, 2013

Taking a break from the trains as we catch up on the other things that life throws at us.  Here is the layout as it stands right now.  We'll probably do some small work this winter but our time will be taken up with other things.  Don't worry, we'll be back to it soon enough!  :)


Friday, August 23, 2013

Mina County has a covered bridge!!!!!

Continuing work...coming along great.  Here are some photos that detail the highlights:

This is a bridge I've been working on, laser-cut wood, assembled with Elmer's all-purpose glue put on thin with a brush.  Two weeks of work and it's finally done but for the weathering.

A little pond at the bottom of rock outcroppings along the track.  Not entirely done yet.

A collapsed building between the tracks before Jasper Rock (what I've been calling that monolith in my mind).  I rebuilt Jasper Rock, coated it with gypsum, added hydrocal molded rocks and painted it.

My dad built this building out of paper!!!!  Looks pretty damned great!

The river, after a final coat of blue-tinted varnish. I still want to add some more rocks.

This was a couple of blocks of 2" pink foam.  I carved the strata using a hot wire carver, coated it in gypsum and painted it.  No rock molds were used to make this at all.

This stone retaining wall was made from a thin sheet of foam, cut with shallow cuts with a hot knife and painted with three different colors of acrylic only partially mixed together.  The cliffs here were done the same way the ones above were.

Sunday, August 18, 2013

August 18th, 2013: Cliffs and Trees

So now I am carving the cliff faces directly into the foam and have made a large amount of hydrocal rock molds.  Father is continuing to lay out ground texture and building trees.  The whole thing is coming along nicely.  Enjoy the video!


Monday, July 29, 2013

Major Progress (July 24th, 2013)

I was away chasing storms and came back to find some areas of the layout transformed.  A new village, most of the trackage ballasted and some amazing terrain put in.  I finished working on the river, painting earth tones onto the upper layer and then pouring the top layer.  I thought I had sealed the ends of the river but it turned out not to be so.  Fortunately, Minwax Polyacrylic (which we are using for the river) is water-soluble, which is why I bought it to begin with.  New cliffs have been carved and covered with gypsum, new houses and trees have been constructed and even the roughing out of the road leading from the manufacturing area to the village with a set of switchbacks to the lower town has been constructed.  Things are coming along very nicely!


Tuesday, July 2, 2013

Amazing Progress!!!!

So, after a month of working we have made some serious changes.  Painting on cliffs, putting on Fusion Fiber and texturing...and today I painted the river!  Check it out in the video here: