Friday, August 23, 2013

Mina County has a covered bridge!!!!!

Continuing work...coming along great.  Here are some photos that detail the highlights:

This is a bridge I've been working on, laser-cut wood, assembled with Elmer's all-purpose glue put on thin with a brush.  Two weeks of work and it's finally done but for the weathering.

A little pond at the bottom of rock outcroppings along the track.  Not entirely done yet.

A collapsed building between the tracks before Jasper Rock (what I've been calling that monolith in my mind).  I rebuilt Jasper Rock, coated it with gypsum, added hydrocal molded rocks and painted it.

My dad built this building out of paper!!!!  Looks pretty damned great!

The river, after a final coat of blue-tinted varnish. I still want to add some more rocks.

This was a couple of blocks of 2" pink foam.  I carved the strata using a hot wire carver, coated it in gypsum and painted it.  No rock molds were used to make this at all.

This stone retaining wall was made from a thin sheet of foam, cut with shallow cuts with a hot knife and painted with three different colors of acrylic only partially mixed together.  The cliffs here were done the same way the ones above were.

Sunday, August 18, 2013

August 18th, 2013: Cliffs and Trees

So now I am carving the cliff faces directly into the foam and have made a large amount of hydrocal rock molds.  Father is continuing to lay out ground texture and building trees.  The whole thing is coming along nicely.  Enjoy the video!


Monday, July 29, 2013

Major Progress (July 24th, 2013)

I was away chasing storms and came back to find some areas of the layout transformed.  A new village, most of the trackage ballasted and some amazing terrain put in.  I finished working on the river, painting earth tones onto the upper layer and then pouring the top layer.  I thought I had sealed the ends of the river but it turned out not to be so.  Fortunately, Minwax Polyacrylic (which we are using for the river) is water-soluble, which is why I bought it to begin with.  New cliffs have been carved and covered with gypsum, new houses and trees have been constructed and even the roughing out of the road leading from the manufacturing area to the village with a set of switchbacks to the lower town has been constructed.  Things are coming along very nicely!


Tuesday, July 2, 2013

Amazing Progress!!!!

So, after a month of working we have made some serious changes.  Painting on cliffs, putting on Fusion Fiber and texturing...and today I painted the river!  Check it out in the video here:


Wednesday, May 15, 2013

Full Speed Ahead!!!!


GoDaddy finally got the release from my old provider and www.markrosengarten.com is back in business, baby!!!!!  I just got the links pages up for the topic-by-topic links to the relevant YouTube videos back.

Mark Rosengarten (dot com?)

Blogger.com is not seeing my YouTube videos for this account.  Until the problem is resolved, here is the link to the video:

Link to video

Friday, April 12, 2013

Building a mountain!

Saturday's build time had me making a mountain.  Tomorrow I paint it!  We've been having difficulties...Digitrax lied to us about a warranty return and exchange, so we're still without the booster and the trains we ordered that were supposed to come with DCC decoders didn't.  We are at a very frustrating point in the build but we'll hopefully be past it soon.

Wednesday, March 27, 2013

March 26th, 2013: Track is Done!!!

Well, the train mountain platforms are laid, the foam is all cut and placed and the track is now all set.  We have to make modifications as we delve into DCC (a whole new adventure) but my job will shortly turn to placing the landscaping in.  I built a couple of model buildings today while father played with wiring.  Tomorrow we head to the shop in Marlboro for gear and advice.  Went to the train show in Kingston on Sunday and while it was small and a little disappointing we stocked up on all the Woodland Scenics stuff we're going to need, including casts for molding hydrocal.

Here's the video: